# US EV Charging: Market Size, Leaders and Investment Priorities

## Executive Summary

**Scope: United States. Information cutoff: November 5, 2026. All monetary figures are in US dollars.**

- **Multibillion-Dollar Market**: Grand View Research estimates approximately **$5.92B of US charging-infrastructure revenue in 2025**, forecasting approximately **$36.99B by 2033**. These are infrastructure-market estimates, not electric-vehicle sales or an official charging-industry revenue census. Treat the forecast as an expansion scenario, not assured demand. [3]
- **Substantial Installed Base**: An industry association's Q2 2026 report records **250,158 publicly accessible charging ports**. Separately, Paren reports **80,964 public DC fast-charging ports across 14,614 locations in Q3 2026**. Different dates and coverage make these complementary snapshots, not directly interchangeable totals. [26][32]
- **Tesla Leads, Competition Broadens**: Tesla accounts for **49.3%** of Paren's Q3 public fast-charging port base. Electrify America, EVgo, IONNA and retailer-led networks offer distinct alternatives; network operators must increasingly compete on location, experience and utilization rather than connector availability alone. [19]
- **Location Matters More Than National Averages**: Q3 fast-charging utilization averages **15.9%**, but reaches **21.1% in the top 30 metros versus 11.0% elsewhere**. Prioritize site-level demand and energized grid capacity over nationwide adoption narratives. [5]
- **Growth Does Not Guarantee Profit**: EVgo's Q2 2026 charging-network revenue grows **19%**, while total revenue falls **16%** and consolidated GAAP net loss reaches **$46.342M**. Evaluate recurring charging activity, project revenue and cash consumption separately. [31]
- **Customer Experience Remains An Opening**: J.D. Power's 2026 study reports a **12% non-charge visit rate**, despite improvement from 14%. IONNA leads DC fast-charging satisfaction, showing that newer networks can challenge established operators on experience. [27]
- **Incentive Assumptions Must Reset**: The federal charging-infrastructure credit's eligibility deadline is **June 30, 2026**. NEVI funding remains a separate opportunity, but an allocation, an obligation and an operating station represent different stages of delivery. [1][8]
- **Best Opportunities Are Use-Case Specific**: ALDI/IONNA's planned **19-site rollout by 2027** illustrates retail integration; Pennsylvania's **515-port funding announcement** illustrates urban and neighborhood access. Favor projects that solve a specific charging need rather than simply adding stalls. [34][35]


## 1. Market Size: Revenue, Installed Ports and Capital Need

### Published revenue estimates point to scale, not a single consensus

The US charging market is already multibillion-dollar, but its reported size depends on whether the study measures charging infrastructure, charging stations or a narrower service model. The following estimates should **not be added together**.

| Market definition and publisher | Base estimate | Forecast | Published CAGR | Business interpretation |
|---|---:|---:|---:|---|
| Charging infrastructure - Grand View Research | **$5,920.5M in 2025** | **$36,986.7M in 2033** | **25.7%, 2026-2033** | Broad infrastructure planning reference; segmented into slow and fast chargers. [3] |
| Charging stations - IMARC | **$3.20B in 2025** | **$34.20B in 2034** | **28.60%, 2026-2034** | Separate station-market definition, covering residential and commercial applications. [28] |
| Charging as a service - Mordor Intelligence | **$82.70M in 2025; $100.89M estimated for 2026** | **$263.01M in 2031** | **21.12%, 2026-2031** | A narrower service-model market, not total US charging expenditure. [2] |

The two broader studies put published 2025 estimates between **$3.20B and $5,920.5M**, but that spread is a difference between studies, not a statistical confidence interval. Their strong forecasts support a long-term opportunity; they do not establish a completed full-year 2026 revenue figure. [28][3]

### Physical infrastructure provides a second measure of market scale

| Infrastructure snapshot | Reported scale | Coverage limitation |
|---|---|---|
| Public charging, Q2 2026 association report | **250,158 ports: 177,139 Level 2 and 73,019 DC fast** | Publicly accessible infrastructure. [26] |
| EIA/AFDC, July 2026 | **284,760 ports at 84,859 locations** | Includes public and private infrastructure, but excludes single-family residential locations. [30] |
| Paren public fast charging, Q3 2026 | **80,964 ports at 14,614 locations** | DC fast charging only. [32] |

A port serves a vehicle; a location can contain several ports. These snapshots show why station counts, port counts and revenue answer different commercial questions. EIA also cautions that its administrative records cover known infrastructure rather than the entire population or a statistically representative sample. [30]

### NREL's 2030 scenario illustrates the investment requirement

NREL models a scenario with **33M plug-in vehicles** requiring **26.8M private Level 1/2 ports, 1M public Level 2 ports and 182,000 public DC fast ports** by 2030. This is a conditional infrastructure-needs scenario, not an observation of today's market. [6]

Its estimated cumulative capital requirement is **$53B-$127B**, including **$31B-$55B for publicly accessible charging**. Those figures cover customer-side charging equipment and installation, while excluding utility-side grid upgrades, operating costs and other specified costs. They therefore cannot be compared directly with one year's supplier revenue. **Investment implication: separate annual revenue opportunity, installed infrastructure and cumulative capital needs in every business case.** [6]


## 2. Key Players: Tesla's Scale Meets Several Different Challengers

### Public fast-charging leadership is not the same as equipment leadership

The table uses Paren's consistent Q3 2026 operator snapshot where available. Hardware vendors, host-owned networks and charging-management platforms have different economic roles and should not be ranked as if they all own the same assets.

| Player | Main position | Dated scale or performance evidence | Competitive implication |
|---|---|---|---|
| **Tesla Supercharger** | Large public DC fast-charging operator; also supplies charging technology | **39,952 ports; 49.3%** of Paren's Q3 base. [19] | Scale remains its central advantage; supplying other operators creates another route to market. [12] |
| **Electrify America** | Public high-power network | **5,357 ports; 6.6%**, Q3. [19] | Existing locations and equipment renewal matter alongside expansion. |
| **EVgo** | Own-and-operate public network plus partner deployment through eXtend | **3,997 ports; 4.9%**, Q3; eXtend is a distinct partner model. [19][31] | Separate owned-network economics from partner construction and service activity. |
| **IONNA** | Automaker-founded charging network | **1,575 ports; 1.9%**, Q3; more than **180 live sites** announced September 30. [19][13] | A fast-growing experience-led challenger rather than a scale leader yet. |
| **Red E** | Public fast-charging operator | **2,174 ports; 2.7%**, Q3. [19] | A meaningful competitor beyond the best-known national brands. |
| **Walmart** | Retail-anchored charging operator | **964 ports; 1.2%**, with **344 ports added in Q3**. [19] | Retail site access creates a distinct deployment channel. |
| **ChargePoint** | Charging hardware, subscriptions, software and services | Q2 FY2027 revenue **$116.1M**; connects drivers to almost **1.5M public and private ports worldwide**. [22] | Worldwide accessible ports are not equivalent to US company-owned ports. |
| **Blink Charging** | Equipment supplier and charging owner/operator | Q2 2026 revenue approximately **$21.7M**; operates globally. [24] | A hybrid model with both equipment-sales and operating exposure. |
| **Mercedes-Benz Charging Network / Rivian Adventure Network** | Experience-focused networks | J.D. Power 2026 DC fast-charging satisfaction scores of **797 / 755**, respectively. [27] | Quality differentiation is visible even without Tesla-sized footprints. |

The market also includes **bp pulse** in public/fleet charging, **EV Connect** in charging management, and equipment specialists such as **Kempower**, whose North American product range supports public charging and fleets. These are important ecosystem participants, not directly comparable operator-share categories. [21][23]

### Tesla and EVgo show that rivals can also become suppliers and customers

Tesla's approximately half-share of the public fast-charging base makes it the scale incumbent. Yet EVgo announces plans to deploy Tesla V4 equipment, with initial sites expected in the second half of 2026 and visibility through Tesla navigation and Trip Planner. The announcement is a deployment plan, not proof that all planned sites are operating by this report's cutoff. [19][12]

This relationship exposes a non-obvious competitive tension: an operator can compete with Tesla for charging sessions while buying Tesla's technology and benefiting from its driver-routing ecosystem. The strategic inference is that equipment, software access, customer acquisition and site operations increasingly constitute separate competitive layers.

### Pilot, GM and EVgo demonstrate the power of partnership distribution

Their joint network surpasses **300 locations and 1,300 charging stalls across 40 states** in August 2026, against a future goal of up to **500 locations and 2,000 stalls**. Those partner sites should not automatically be counted as EVgo-owned assets. [10][31]

**Competitive implication: choose counterparties by the layer they control - site, equipment, network software, customer relationship or operating asset - rather than treating every charging brand as the same business.**


## 3. Demand: Cities, Retail Stops and Depots Need Different Products

### Electrified-vehicle growth can overstate charging demand

Urban Science's Q3 2026 retail data show sharply divergent powertrain trends:

| Powertrain | Q3 retail sales | Year-over-year change | Share of retail sales |
|---|---:|---:|---:|
| Battery electric vehicles | **242,413** | **-40.9%** | **7.4%** |
| Plug-in hybrids | **44,672** | **-38.0%** | **1.4%** |
| Non-plug-in hybrids | **575,246** | **+28.0%** | **17.7%** |

Source: Urban Science's US retail-sales report; these are not total wholesale deliveries or vehicles already on the road. [33]

The distinction matters commercially: growth in non-plug-in hybrids does not create plug-in charging demand. Conversely, weak new plug-in sales do not mean the installed vehicle fleet stops charging. The association's Q2 report puts EVs in operation at approximately **7.8M**, illustrating the importance of the existing fleet alongside new sales. [26]

### Match the charging product to the driver's actual constraint

| Use case | Priority offering | Commercial focus |
|---|---|---|
| Single-family homes | Right-sized residential charging and managed schedules | Installation cost and household capacity; NREL's scenario assigns most ports to private charging. [6] |
| Apartments and curbside parking | Accessible neighborhood Level 2 charging | Reliable overnight access, allocation and payment. Pennsylvania's awards include on-street installations. [35] |
| Workplace and destination parking | Charging aligned with longer parking periods | Host economics and dependable service rather than maximum power alone. |
| Grocery, restaurants and travel stops | Charging matched to shopping or stopping time | Location quality, amenities and repeat visits. [34][10] |
| Delivery and commercial fleets | Depot charging with controlled schedules | Vehicle availability, contracted demand and utility capacity. [29] |

These are distinct products, not one interchangeable charging-station market. The recommendations above emphasize customer needs rather than assuming every site requires the fastest available charger.

### ALDI and IONNA turn charging into part of a routine trip

ALDI and IONNA open their first partnership location in Roseville, Minnesota, with **19 ALDI locations planned by 2027**. The proposition combines grocery retail with high-speed charging so drivers can recharge while completing an existing errand. [34]

The mechanism is trip integration: charging competes less directly with the driver's time when it fits an activity already planned. This does not prove every grocery site will be profitable; it suggests that parking patterns, local EV density and actual shopping duration should guide deployment.

The geographic evidence reinforces that selectivity. Paren's top-30-metro utilization of **21.1%**, compared with **11.0% elsewhere**, implies materially different asset productivity across locations. **Demand implication: prioritize a defined customer need and a credible utilization pathway, not simply a large retail footprint or a favorable national forecast.** [5]


## 4. Economics: Charging Growth and Corporate Profitability Can Diverge

### Public-company results expose different revenue and cost structures

| Company | Latest completed annual revenue | Latest reported quarter available here | Quarterly consolidated GAAP net loss | Financial scope |
|---|---:|---:|---:|---|
| ChargePoint | **$411.224M**, year ended January 31, 2026. [9] | **$116.075M**, quarter ended July 31, 2026. [9] | **$35.6M**. [22] | Global equipment, subscriptions and services. [22] |
| EVgo | **$384.086M**, year ended December 31, 2025. [9] | **$82.648M**, quarter ended June 30, 2026. [31] | **$46.342M**. [31] | Public-network and partner-related company revenue, not charging electricity alone. [31] |
| Blink Charging | **$103.520M**, year ended December 31, 2025. [9] | **$21.674M**, quarter ended June 30, 2026. [9] | **$6.0M**. [24] | Global equipment, charging services and other activities. [24] |

These figures are **not US charging-market shares**: fiscal calendars, geographic coverage, asset ownership and revenue recognition differ. They nevertheless show why industry expansion should not be equated with profitable supplier growth.

### EVgo: More charging activity, lower total revenue

EVgo's Q2 charging-network revenue reaches **$61.421M, up 19%**, while throughput reaches **99 GWh, up 13%**. Yet total revenue falls **16%** to $82.648M and consolidated GAAP net loss widens to $46.342M. [31]

The lesson is not that charging demand is absent. Rather, recurring charging activity and total corporate results can move in different directions. For investment analysis, energy throughput, network revenue, partner-project revenue and corporate costs need separate treatment; a single headline growth rate can obscure the underlying business.

### ChargePoint: Recurring subscriptions improve the mix, but losses persist

ChargePoint reports **18% quarterly revenue growth**, with subscription revenue increasing **10% to $43.7M**. Nevertheless, it records a $35.6M GAAP net loss and ends July with **$95.7M in cash, cash equivalents and restricted cash**. [22]

This is the counterweight to a simple software-margin thesis: recurring revenue is valuable, but it does not eliminate hardware, support, development or corporate funding requirements. The commercial inference is to assess subscription attachment and retention alongside gross margin and cash consumption, not in isolation.

### Evaluate the site before underwriting the network

Paren reports a national average fast-charging price of **$0.540/kWh** and time-based utilization of **15.9%** in Q3. Neither figure is a profit margin: utilization measures time spent charging, not average delivered power or revenue per stall. [5]

A practical contribution model starts with energy sales and subtracts electricity costs, demand charges where applicable, rent, maintenance, payment costs and support. Capital recovery, financing and corporate overhead must then be considered separately. **Economic implication: underwrite delivered kWh, realized pricing and complete cash costs; port growth alone is an inadequate investment metric.**


## 5. Technology: Interoperability and Maintenance Outrank Nameplate Power

### Higher power expands capability, but does not guarantee a better session

In Q3 2026, **73% of newly installed ports are rated at least 250 kW**. Non-Tesla networks install **677 NACS ports**, representing **23% of new non-Tesla connectors**. These are shares of new deployment, not shares of the entire installed base. [19]

The investment response should be to evaluate delivered charging performance, compatibility and site power management rather than assume a higher nameplate rating automatically produces greater revenue. Kempower's North American range illustrates the equipment opportunity: modular power units and satellite chargers serve public sites and fleets, while its MCS/CCS offering addresses heavy-duty charging. Product availability should not be confused with proven nationwide deployment or market leadership. [23]

### Open interfaces address different layers of lock-in

Federal charging-program interoperability requirements specify several complementary interfaces:

| Interface | Layer addressed | Commercial relevance |
|---|---|---|
| **ISO 15118 / Plug and Charge** | Vehicle-to-charger interaction | Supports compatible automatic authentication and charging. [15] |
| **OCPP 2.0.1** | Charger-to-network communication | Separates charging equipment from a proprietary-only back office. [15][16] |
| **OCPI 2.2.1** | Network-to-network communication | Supports interoperability across charging networks. [15][16] |

These are requirements within the relevant federal regulatory framework, not a claim that every US charger already complies. The rules also require secure switching of network providers without hardware changes and support remote monitoring, diagnostics and smart charge management. The procurement implication is to make migration rights, security, data access and ongoing support explicit. [15][16]

### Electrify America's California work shows the retrofit opportunity

Electrify America reports **seven new California stations opened and 26 stations upgraded** in Q2 2026. Its California network includes over **1,400 chargers across more than 280 sites**, and it deploys fourth-generation charging equipment. [25]

Upgrading more stations than it opens reveals an opportunity beyond greenfield construction: equipment replacement, commissioning, monitoring and maintenance can improve the value of existing sites. For suppliers and service companies, the installed base is therefore a customer pool in its own right.

Customer evidence supports that focus. J.D. Power's 2026 study records DC fast-charging satisfaction improving to **666**, while public Level 2 satisfaction declines to **595**; **12% of visits still do not result in charging**. That non-charge measure is broader than equipment failure and should not be treated as an uptime statistic. **Technology implication: compete on successful sessions and serviceability, not just maximum advertised power.** [27]


## 6. Policy and Grid Risk: Funding Must Become Energized Capacity

### Federal support remains material, but eligibility has changed

The infrastructure law provides **$5B for NEVI and $2.5B for CFI across FY2022-FY2026**. Separately, federal clean-vehicle credit eligibility ends in September 2025, and the charging-infrastructure credit has a **June 30, 2026** placed-in-service deadline. A new project's base case should not assume the expired infrastructure credit. [8][1]

These are distinct mechanisms: grant-program funding is not the same as a tax credit, and a credit deadline does not by itself cancel a NEVI award. Confusing them can distort both demand forecasts and project financing.

### NEVI illustrates the gap between budget authority and delivery

The Congressional Research Service's **June 16, 2026** report states that **$4.2B** in NEVI formula funds has been made available for obligation. It cites obligations of **$1.4B as of December 31, 2025** and an estimated **183 operating NEVI-funded stations across 20 states**. These figures have different observation dates and should not be presented as a single November operating snapshot. [8]

The same report describes revised August 2025 guidance and a January 2026 court judgment restricting unlawful withholding of NEVI funds. The operational lesson is that legal availability, state approval, grant contracting, utility work and commissioning remain separate milestones. [8]

Pennsylvania offers a more recent local example: its November announcement directs **$37M toward 515 planned public ports** across the Philadelphia region. That includes **157 on-street Level 2 ports in 13 Philadelphia neighborhoods**, plus funding for another **62 curbside ports** in suburban counties. This is awarded future infrastructure, not 515 completed ports. [35]

### PepsiCo shows that connection flexibility can be more valuable than waiting

RMI describes flexible service connections in which utilities provide power sooner in exchange for limits during constrained periods. It reports utility pilots involving National Grid, Southern California Edison and PG&E, and describes PepsiCo expanding a site from **30 to 50 electric trucks 18 months sooner** than conventional planning would allow. PepsiCo estimates **$1M in fuel savings**. [29]

The trade-off is operational: earlier energization comes with power-management obligations. A separate DOE-supported five-state study models a **30% reduction in incremental distribution-grid investment** when home and depot loads are managed. That is a scenario-specific result, not a guaranteed national saving. [18]

**Risk implication: make financing contingent on documented grant conditions, credible energization milestones, realistic utilization and workable operating restrictions. Political authorization and a signed site lease are not substitutes for deliverable power.**


## Synthesis: Where to Compete and What to Monitor

The evidence points to a market with substantial long-term infrastructure needs but uneven near-term economics. Published revenue forecasts are strong, while Q3 plug-in retail sales weaken, utilization varies sharply by geography, and major public charging companies remain loss-making. The apparent contradiction disappears once national infrastructure need is separated from the profitability of a particular site or supplier. [3][33][5][22][31][24]

### Compare strategies across monetization, scope and capital exposure

| Strategy and representative players | Monetization mechanism | Customer scope | Capital exposure and trade-off | Recommended commercial test |
|---|---|---|---|---|
| **Tesla** | Operate charging assets and supply technology to others | Public fast charging and operator customers | Network ownership plus supplier opportunity; competition and cooperation coexist. [19][12] | Track productive operating capacity and third-party deployment, not announcements alone. |
| **Electrify America, EVgo, Red E** | Operate public charging; EVgo also uses partner models | Urban and corridor charging | Asset renewal, operating costs and utilization; partner assets complicate headline comparisons. [25][31][19] | Compare delivered energy, maintenance performance and cash contribution. |
| **IONNA, Mercedes-Benz, Rivian** | Differentiate the charging experience | Branded public networks | Site rollout must preserve the experience that supports high satisfaction. [13][27] | Test whether satisfaction translates into repeat use as footprint expands. |
| **Walmart, ALDI/IONNA, Pilot/GM/EVgo** | Integrate charging with retail or travel stops | Existing shopping and travel trips | Asset ownership varies by partnership; location quality must become actual demand. [19][34][10] | Evaluate charging economics and host benefits separately. |
| **ChargePoint and Blink** | Equipment, services and subscriptions; Blink also owns/operates charging | Hosts, businesses and drivers, including international activity | Hardware demand and cash needs persist despite recurring services. [22][24] | Prioritize service attachment, margins, support obligations and liquidity. |
| **Kempower and EV Connect** | Equipment specialization or charging-management services | Site operators and fleets | Product/platform exposure rather than a directly comparable national owned-port share. [23][21] | Require interoperability, maintainability and an economic migration path. |
| **bp pulse and managed fleet solutions** | Public/fleet charging and management | Fleets and charging customers | Fleet schedules and available power constrain deployment choices. [21][29] | Secure demand and workable charging windows before committing capacity. |

The strongest strategic tension is that **scale, experience and asset ownership are different advantages**. Tesla leads the port base, IONNA leads the cited satisfaction ranking, and ChargePoint's broad worldwide connectivity does not imply ownership of those ports. None of these measures alone determines investment quality. [19][27][22]

For near-term deployment, prioritize dense demand pockets, retail sites with a credible charging use case, grid-ready fleet depots and maintenance of valuable existing locations. Approach lightly utilized greenfield sites more selectively, particularly where economics depend on uncertain incentives or an optimistic adoption forecast. The ALDI, Electrify America and PepsiCo cases show three different value-creation routes: integrate an existing trip, improve an installed asset, or accelerate usable power. [34][25][29]

**Bottom line:** The US EV charging market offers meaningful growth, but the best opportunities are not simply the largest announced networks. Monitor delivered kWh per stall, successful-session rates, realized revenue per kWh, all-in electricity costs, time to energization and cash consumption. Build the investment case around a specific customer and operating advantage, then treat market growth as support rather than a substitute for sound unit economics.

## References

1. *Alternative Fuels Data Center: Tax Credits for Electric Vehicles and Charging Infrastructure*. https://afdc.energy.gov/laws/ev-tax-credits
2. *United States EV Charging As A Service Market Size, Share & 2031 Growth Trends Report*. https://www.mordorintelligence.com/industry-reports/united-states-ev-charging-as-a-service-market
3. *The United States Electric Vehicle Charging Infrastructure Market Outlook, 2033*. https://www.grandviewresearch.com/horizon/outlook/electric-vehicle-charging-infrastructure-market/united-states
4. *2025 U.S. Electric Vehicle Experience (EVX) Public Charging Study - JD Power*. https://www.jdpower.com/business/press-releases/2025-us-electric-vehicle-experience-evx-public-charging-study
5. *Paren | US EV Fast Charging — Q3 2026*. https://www.paren.app/reports/us-ev-fast-charging-q3-2026
6. *The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure*. https://afdc.energy.gov/files/u/publication/2030-charging-network.pdf
7. *EV Fast Charging*. https://www.transportationenergy.org/wp-content/uploads/2026/08/TEI-CAP_EV-Fast-Charging-Pulse-Check_US_Q126-20260713.pdf
8. *Implementation of Electric Vehicle Charging Infrastructure Programs: CFI and NEVI | Congress.gov | Library of Congress*. https://www.congress.gov/crs-product/R48996
9. *Fiscal.ai /v1/company/financials/income-statement/standardized*. https://fiscal.ai
10. *Pilot, General Motors and EVgo Power EV Road Trips with More Than 300 Fast-Charging Locations Nationwide | EVgo | Electric Vehicle (EV) Charging Stations - EV Fast Chargers*. https://www.evgo.com/press-release/pilot-general-motors-and-evgo-power-ev-road-trips-with-more-than-300-fast-charging-locations-nationwide/
11. *Alternative Fuels Data Center: U.S. Public and Private Electric Vehicle Charging Infrastructure*. https://afdc.energy.gov/data/widgets/10964?chart_only=true
12. *EVgo Expands Fast Charging in the U.S. with Supercharger Deployment  | EVgo | Electric Vehicle (EV) Charging Stations - EV Fast Chargers*. https://www.evgo.com/press-release/evgo-expands-fast-charging-in-the-us-with-supercharger-deployment
13. *IONNA Ranked #1 in JD Power Study as Network More than Doubles Size During 2026 | IONNA*. https://www.ionna.com/news/ionna-ranked-1-in-jd-power-study-as-network-more-than-doubles-size-during-2026/
14. *US EV Charging Station Market Size, Share,Trends, Growth Analysis Report, 2031*. https://www.marketsandmarkets.com/Market-Reports/geography/electric-vehicle-supply-equipment-market/US
15. *23 CFR § 680.108 Interoperability of electric vehicle charging infrastructure.*. https://www.ecfr.gov/current/title-23/section-680.108
16. *23 CFR § 680.114 Charging network connectivity of electric vehicle charging infrastructure.*. https://www.ecfr.gov/current/title-23/section-680.114
17. *Largest DC Fast-Charging Networks in the US: September 2026*. https://evchargingstations.com/chargingnews/dc-fast-charging-september-2026
18. *Multi-State Transportation Electrification Impact Study: Preparing the Grid for Light-, Medium-, and Heavy-Duty Electric Vehicles*. https://www.energy.gov/sites/default/files/2024-03/2024.03.18%20NREL%20LBNL%20Kevala%20DOE%20Multi-State%20Transportation%20Electrification%20Impact%20Study%20FINAL%20DOCKET.pdf
19. *cdn.prod.website-files.com*. https://cdn.prod.website-files.com/66a757a57add49ec2a7c112b/6ac964354f7c0bf6ee68f10d_Paren-Q3-2026-US-SOTI.pdf
20. *News Releases - EVgo Services LLC*. https://investors.evgo.com/news-events/news-releases
21. *Tracxn Private Data*. https://tracxn.com
22. [
	ChargePoint Holdings, Inc. - ChargePoint Reports Second Quarter Fiscal Year 2027 Financial Results
](https://investors.chargepoint.com/news/news-details/2026/ChargePoint-Reports-Second-Quarter-Fiscal-Year-2027-Financial-Results/default.aspx)
23. *Kempower | DC Charging Solutions for Fleets & Businesses*. https://kempower.com/america
24. *Blink Charging Announces Second Quarter 2026 Financial Results*. https://blinkcharging.com/news/blink-charging-announces-second-quarter-2026-financial-results
25. *Q2 2026 Report to the California Air Resources Board*. https://media.electrifyamerica.com/assets/applications/original/1417-public-2026-q2-carb-quarterly-report-final.pdf
26. *2026 Q2 Get Connected Press Release*. https://www.autosinnovate.org/posts/press-release/2026-q2-get-connected-press-release
27. *2026 U.S. Electric Vehicle Experience (EVX) Public Charging Study - JD Power*. https://www.jdpower.com/business/press-releases/2026-u-s-electric-vehicle-experience-evx-public-charging-study
28. *U.S. Electric Vehicle Charging Station Market Report 2034*. https://www.imarcgroup.com/united-states-electric-vehicle-charging-station-market
29. *Electrification 101: Enabling Truck Charging with Flexible Service Connections - RMI*. https://rmi.org/resources/electrification-101-enabling-truck-charging-with-flexible-service-connections
30. *Appendix F*. https://www.eia.gov/totalenergy/data/monthly/pdf/mer_F_FULL.pdf
31. *EVgo Inc. Reports Second Quarter 2026 Results - Wed, 08/05/2026 - 07:30*. https://investors.evgo.com/news-releases/news-release-details/evgo-inc-reports-second-quarter-2026-results
32. *US fast charging points top 80,000 in Q3 | Electric Vehicle Charging & Infrastructure*. https://www.evcandi.com/news/us-fast-charging-points-top-80000-q3
33. *Q3 2026 U.S. EV Sales Report: Hybrids Sustain Electrified Share | Urban Science*. https://www.urbanscience.com/resources/q3-2026-us-ev-sales-report-hybrids-sustain-electrified-share
34. *ALDI and IONNA Open First EV Charging Location in Minnesota, Plan 19 Sites Nationwide - EVinfo.net*. https://evinfo.net/2026/10/aldi-and-ionna-open-first-ev-charging-location-in-minnesota-plan-19-sites-nationwide
35. *Pennsylvania is way ahead on NEVI charging – now comes another $37M | Electrek*. https://www.electrek.co/2026/11/03/pennsylvania-is-way-ahead-on-nevi-charging-now-comes-another-37m